CAPITAL INVESTMENTS | Wastewater

7th Street Manhole Replacement

Manhole replacement for 7th Street.

DESCRIPTION

PROJECT ID: S 4.0
ESTIMATED COST: $20,000
ACTUAL COST: $5,000
  • Replaces the existing brick manhole on 7th Street
  • New cast-in-place base section and precast manhole will be installed
  • Will include traffic control, groundwater pumping system and sewage bypass pumping

WHY IT’S NEEDED

The existing structure is missing several bricks, allowing water to infiltrate the collection system. There is a risk of catastrophic failure in the roadway.

Due to the relatively small size of the project, obtaining a private contractor was challenging.  This resulted in substantial financial savings by performing the work with City staff, but significantly delayed the project as adequate staff resources had to be temporarily re-assigned from their regular duties operating the system.

PROJECT STATUS:
Complete
PROJECT MILESTONES

October 2020

Completed replacement with City of Hermiston staff.

LAST UPDATED: 10/27/20