CAPITAL INVESTMENTS | Wastewater

Lift Station No. 1 Ventilation System Replacement

Lift Station No. 1.

DESCRIPTION

PROJECT ID: S 7.0
ESTIMATED COST: $60,000
ACTUAL COST: TBD
  • Installs a new ventilation system and carbon filter on the vent discharge point
  • Will minimize odors and reduce maintenance time and costs

WHY IT’S NEEDED

Life station ventilation systems are extremely important to safeguard the lives of wastewater operators. Hydrogen sulfide gas is dangerous and corrosive, endangering life and shortening equipment life. The system should be replaced to protect workers and maximize the life of components of the lift station.

PROJECT STATUS:
Planned
PROJECT MILESTONES

Scheduled for 2019-2020

LAST UPDATED: 01/28/20

City of Hermiston
180 NE 2nd Street, Hermiston, OR 97838
Phone: (541) 567-5521 | TTY/TDD @ 1-800-735-2900
Email: city@hermiston.or.us

© Copyright - City of Hermiston