CAPITAL INVESTMENTS | Wastewater

Sewer Collection System Capacity Improvements (Phase II)

The S.E. Street gravity sewer line.

DESCRIPTION

PROJECT ID: S 14.0
ESTIMATED COST: $240,000
ACTUAL COST: TBD
  • Replaces existing sanitary sewer lines that are in poor condition or have capacity limitations
  • Installs new polyvinyl chloride sewer pipe and precast manholes
  • Includes roadway restoration, traffic control, and sewage bypass pumping

WHY IT’S NEEDED

The existing sewer line lacks the capacity to expand service in collection area. Replacement will ensure development won’t be limited.

PROJECT STATUS:
Planned
PROJECT MILESTONES

Scheduled for 2022-23

LAST UPDATED: 01/28/20