- Project includes sandblasting, priming, and painting all exterior surfaces.
- May require draining reservoir to ensure proper paint curing.
*plus inflation depending on year constructed
WHY IT’S NEEDED
Repainting is needed to minimize further corrosion of the steel plates. The reservoir was last painted in 1987. A new protective coat will help prevent rusting.
PROJECT STATUS:
Potential
PROJECT MILESTONES
Scheduled for 2026-27.