CAPITAL INVESTMENTS | WATER
Well No. 6, Reservoir No. 2 Exterior Painting
DESCRIPTION
PROJECT ID: | W 24.0 |
ESTIMATED COST: | $115,000* |
ACTUAL COST: | TBD |
- Project includes sandblasting, priming, and painting all exterior surfaces.
- May require draining reservoir to ensure proper paint curing.
*plus inflation depending on year constructed
WHY IT’S NEEDED
Repainting is needed to minimize further corrosion of the steel plates. The reservoir was last painted in 1996. A change in color is also recommended to prevent pheasants from flying into the reservoir.
PROJECT STATUS:
Potential
PROJECT MILESTONES
Scheduled for 2026-27.
LAST UPDATED: 01/18/23