CAPITAL INVESTMENTS | Wastewater
Lift Station No. 7 Reconstruction
Lift Station No. 7.
DESCRIPTION
PROJECT ID: | S 16.0 |
ESTIMATED COST: | $610,000 |
ACTUAL COST: | TBD |
- Installs duplex pumps and upgraded electrical and control systems
- Replaces existing mechanical pumps, rails, and valves
- Replaces roof structure with a lid integrated into the sidewalk
- Wetwell storage capacity may need to be increased based on growth predictions
WHY IT’S NEEDED
The pump station was built in approximately 1981. The existing duplex pumps and electrical systems need to be replaced.
PROJECT STATUS:
Planned
PROJECT MILESTONES
Schedule for 2023-24
LAST UPDATED: 01/18/23