CAPITAL INVESTMENTS | Wastewater

E. Evelyn Avenue Sewer Line Replacement

E. Evelyn Avenue in Hermiston.

DESCRIPTION

PROJECT ID: S 10.0
ESTIMATED COST: $240,000
ACTUAL COST: TBD
  • Replaces 650 feet of sewer line on E. Evelyn Ave. between S.E. 8th Street to S.E. 9th Street
  • Design report will evaluate relocation alternatives for existing main in residence backyards
  • Bypass line will be installed within the roadway
  • May include installation of polyvinyl chloride sewer pipe and precast manholes
  • Roadway restoration, traffic control, and sewage bypass pumping is included

WHY IT’S NEEDED

The existing sewer line lacks the capacity to provide expanding service to the Eastern Oregon Trade and Event Center and Cook Industrial Area. The replacement will allow continued development in the area.

PROJECT STATUS:
Planned
PROJECT MILESTONES

Scheduled for 2020-21

LAST UPDATED: 01/28/20