CAPITAL INVESTMENTS | Wastewater
Lift Station No. 4 Reconstruction
Lift Station No. 4.
DESCRIPTION
PROJECT ID: | S 11.0 |
ESTIMATED COST: | $600,000 |
ACTUAL COST: | TBD |
- Includes well structure, pumps, ventilation system, internal piping, and electrical control system upgrades
- Design will need to be analyzed during design and may require additional property for new pump chamber
- Odor control system will need to be included
WHY IT’S NEEDED
Lift Station No. 4 was built in 1981 and the submersible duplex pump station has experienced corrosion on both metal and brick. Replacement of the wetwell will increase capacity, eliminate porous brick, and safeguard the environment. Ventilation of the structure is poor and electrical systems are nearing the end of their expected lives.
PROJECT STATUS:
Planned
PROJECT MILESTONES
Scheduled for 2022-23
LAST UPDATED: 01/18/23