CAPITAL INVESTMENTS | WATER

Moore Booster Pump Station Upgrade

DESCRIPTION

PROJECT ID: W 32.0
ESTIMATED COST: $2,000,000
ACTUAL COST: TBD
  • Replaces about 4,800 feet of asbestos concrete water main with 8-inch ductile iron pipe in two sections:
    • W. Highland Ave. between S.W. 4th Street and S.E. 4th Street
    • S. 1st Street between W. Orchard Ave. and W. Highland Ave.
  • Tees, valves, hydrants, and service lines will also be replaced.

WHY IT’S NEEDED

This project will eliminate failing, deteriorating and undersized lines; reduce repair work; and improve public safety. Proposed pipe replacements will remove some of the oldest pipes within the City water system.

PROJECT STATUS:
Planned
PROJECT MILESTONES

Scheduled for
2028-2029

LAST UPDATED: 02/18/25

© Copyright - City of Hermiston