CAPITAL INVESTMENTS | WATER
Moore Booster Pump Station Upgrade
DESCRIPTION
PROJECT ID: | W 32.0 |
ESTIMATED COST: | $2,000,000 |
ACTUAL COST: | TBD |
- Replaces about 4,800 feet of asbestos concrete water main with 8-inch ductile iron pipe in two sections:
- W. Highland Ave. between S.W. 4th Street and S.E. 4th Street
- S. 1st Street between W. Orchard Ave. and W. Highland Ave.
- Tees, valves, hydrants, and service lines will also be replaced.
WHY IT’S NEEDED
This project will eliminate failing, deteriorating and undersized lines; reduce repair work; and improve public safety. Proposed pipe replacements will remove some of the oldest pipes within the City water system.
PROJECT STATUS:
Planned
PROJECT MILESTONES
Scheduled for
2028-2029
LAST UPDATED: 02/18/25