CAPITAL INVESTMENTS | STREETS

GRATE Phase I: W. Gettman Road Construction

W. Gettman Road between Highway 207 and S. 1st Street.

DESCRIPTION

PROJECT ID: ST 11.0
ESTIMATED COST: $2,800,000*
ACTUAL COST: TBD
  • Develops about 5,250 feet of W. Gettman Road from Highway 207 to S. 1st Street, including paving over the gravel portion and reconstructing paved road not built to city standards.
  • Curbs, gutter, and sidewalks will be included in development projects in the area as they occur. The road will ultimately be developed with sidewalks and bike lanes.
  • Union Pacific and Maxwell Canal crossings will be improved.
  • Underground utility work will be coordinated with road project.

* Plus inflation depending on year constructed

WHY IT’S NEEDED

W. Gettman Road is a narrow gravel roadway on the south edge of Hermiston. The roadway is evolving from its original rural nature and, as development extends, is being utilized as an east-to-west collector.

This is the first phase of the Hermiston Gettman Road/Railway Alternative Transportation Enhancement Project.

PROJECT STATUS:
Potential
PROJECT MILESTONES

Summer 2022

Hard surface applied by Umatilla County.

LAST UPDATED: 02/27/24