CAPITAL INVESTMENTS | STREETS

W. Hermiston Avenue Overlay

Hermiston Avenue was repaved in 2019.

DESCRIPTION

PROJECT ID: ST 2.0
ESTIMATED COST: $490,000
ACTUAL COST: $615,348.91*
  • Resurfaced W. Hermiston Avenue from N. 1st Place to N.W. 11th Street, including smoothing the surface, restoring drainage, and match elevations for roadway, sidewalk and ADA ramps.
  • Restored centerlines and crosswalks.
  • Replaced damaged sidewalks.
  • Coordinated with water and sewer work.

WHY IT’S NEEDED

Repairs were needed to ensure roadway subgrade wasn’t further damaged by water infiltration and to prepare for future traffic volumes.

Roadway cracking and sidewalks that did not meet ADA standards were also considerations.

* The original project scope only called for overlaying the street between 1st and 10th, but upon further review, the Public Infrastructure Committee and the City Council felt that a portion of the street between 1st and 3rd required a full rebuild. This was the the most cost-effective time to replace deteriorating sidewalks in that area and add decorative lights. The final cost was $125,000 above the estimate.

PROJECT STATUS:
Complete
PROJECT MILESTONES

May 2019

The Hermiston City Council approved the contract to begin work on the project.

Media: “Council approves Hermiston Avenue Project” East Oregonian

August 2019

Project begins with cooperation with water department to replace valves under roadway.

September 2019

Several blocks of Hermiston Avenue are closed for three weeks as final section of roadway and sidewalk are completely replaced.

Media: “City’s utilities departments join forces on Hermiston Avenue project” Northeast Oregon Now

LAST UPDATED: 01/31/20

© Copyright - City of Hermiston