CAPITAL INVESTMENTS | WATER
Well 6 Chlorination Structure
Current chlorination system structure for Well No. 6.
DESCRIPTION
PROJECT ID: | W 9.0 |
ESTIMATED COST: | $1,040,000 |
ACTUAL COST: | TBD |
- Block structure building is about 10 feet by 30 feet, to be verified during design
- Ventilation system and chlorination system
- Chlorine scales
- Chlorine emergency alarms
- Safety equipment
WHY IT’S NEEDED
The chlorine room at Well No. 6 is 5 feet by 8 feet and too small for its current use, and is constructed of fiberglass. It was originally constructed to occasionally store chlorination equipment. It is now in constant use and has been damaged during the exchange of chlorine cylinders.
A larger building will allow more efficient operation of the well.
PROJECT STATUS:
In Progress
PROJECT MILESTONES
2023
Design work has begun.
2024
Design work paused to coordinate with design and permitting of nearby “Aquifer Storage & Recovery Well #3” which will use Well #6 as a monitoring well.
2025
Scope Expansion to include on-site generation of chlorine to provide long-term protection from future chlorine supply chain disruptions.
LAST UPDATED: 09/25/25