CAPITAL INVESTMENTS | WATER

Well 6 Reservoir Interior Painting

Well 6 Reservoir.

DESCRIPTION

PROJECT ID: W 13.0
ESTIMATED COST: $220,000
ACTUAL COST: TBD
  • The tank will be drained so the interior can be painted
  • Piping will need protective coat to prevent contamination
  • After painting, reservoir will need to be disinfected before refilling
  • May be combined with Water Project 23.0 to avoid cost of bringing contractor to site twice

WHY IT’S NEEDED

The reservoir was built in 1991 and the interior hasn’t ever been recoated. Without cathodic protection mentioned in Water Project 12.0, a new coat is needed.

PROJECT STATUS:
PROJECT MILESTONES

Scheduled for
2019-2020

LAST UPDATED: 03/04/20